August 2010 (39.92088, -123.76359) Confusion Hill Bridges |
The North Bridge is a 581 ft long continuous prestressed box girder bridge on sloping single column bents (see top photo). This shorter bridge was built using the traditional method of supporting the wet concrete and rebar on falsework.
The South Bridge is a long three span continuous prestressed box girder bridge on vertical single column bents. It has a total length of 1239 ft (348 ft, 571 ft, 436 ft). It was built segmentally using cantilever construction (where the weight of the cured concrete supports the cantilevered spans).
Both bridges were designed by Caltrans engineers and built by Finley Engineering Group out of Tallahassee, Florida and by MCM Construction of California.
2 questions from an amateur.
ReplyDelete1. What is the span of the North bridge?
2. Would it be proper to describe it as a "rigid frame" bridge?
This comment has been removed by the author.
ReplyDeleteDear Bob,
ReplyDeleteThe North Bridge has 3 spans of 176', 229', and 176' for a total length of 581'.
Your right, the diagonal columns result in large axial column loads when the structure is pushed longitudinally, resulting in a very rigid structure.
Mark Y